China hydraulic control valve installation guide: installation position, direction and precautions

China hydraulic control valve installation guide: installation position, direction and precautions

China hydraulic control valve installation guide: installation position, direction and precautions

 

China hydraulic control valve is a commonly used fluid control equipment, the correct installation is essential for its normal operation and service life. This article will provide you with a guide to the installation of hydraulic control valves in China from a professional point of view, including installation position, direction and precautions.

 

1. Determine the installation position

 

(1) Water flow direction: the hydraulic control valve should be installed in the downstream side of the water flow direction in the pipeline system, that is, the opening of the valve should be opposite to the direction of the water flow.

 

(2) Pipeline layout: China hydraulic control valve should be installed in the appropriate position of the pipeline system, avoid installation in the elbow, reduction, branch, etc., so as not to affect the normal work of the valve.

 

(3) Ground height: the hydraulic control valve should be installed in a place with the appropriate ground height to facilitate maintenance and overhaul.

 

2. Determine the installation direction

 

(1) Horizontal installation: Chinese hydraulic control valves should generally be installed horizontally on the pipeline, and the tilt Angle should not be greater than 5 degrees.

 

(2) Vertical installation: If the Chinese hydraulic control valve needs to be installed vertically, a support frame should be set under the valve to maintain the stability of the valve.

 

3. Precautions

 

(1) Ensure that the installation position is accurate: Before installing the Chinese hydraulic control valve, the position and direction of the pipeline system should be carefully checked to ensure that the installation position of the valve is accurate.

 

(2) Ensure that the installation is firm and reliable: the installation of China’s hydraulic control valve should adopt a suitable fixing method, such as flange connection, threaded connection or welded connection, etc., to ensure that the installation is firm and reliable.

 

(3) Ensure that the power supply is normal: if the Chinese hydraulic control valve needs a power supply, check whether the power line is normal before installation to ensure the normal operation of the valve.

 

(4) Ensure that there is enough space before and after the valve: when installing the Chinese hydraulic control valve, it should be ensured that there is enough space before and after the valve to facilitate maintenance and overhaul.

 

In short, the correct installation of China’s hydraulic control valve is crucial to its normal operation and service life. When installing the Chinese hydraulic control valve, attention should be paid to determining the installation location, direction and comply with the relevant precautions. It is hoped that the Chinese hydraulic control valve installation guide provided in this article can help you better complete the installation work.